USR 23 over 475SB &RAMP 23SB TO 475E

0.77 mi. North of USR 20 · County 095, Ohio · Built 1962 · 2 Lanes · 23,927 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
4801059
Year Built
1962
Length
56.7 m (186 ft)
Max Span
23.2 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
23,927
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.