IR 75 over NS RR

.54 Mi. S of SR 12 · County 063, Ohio · Built 2019 · 3 Lanes · 24,378 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3202933
Year Built
2019
Length
81 m (265.7 ft)
Max Span
39.3 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
24,378
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.