C144 HARRISON ST over IR 75

S. of SR68/15 INTERCHANGE · County 063, Ohio · Built 2018 · 2 Lanes · 1,610 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
3202860
Year Built
2018
Length
145.8 m (478.3 ft)
Max Span
56.7 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
1,610
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.