USR 68 SR 15 over LIMA AVE(CR 313)
0.33 mi. S-West of IR75 · County 063, Ohio · Built 2019 · 4 Lanes · 17,879 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
41.0233, -83.667361
This bridge is in worse condition than 6.7% of bridges in County 063. The average bridge in Ohio is 0 years old; this one is 7 years old.
Nearby Bridges
USR 68 RAMP D over LIMA AVE RAMP H
Built 2019
IR 75 over US 68 ""A"" & Lima Ave ""H""
Built 2020
IR 75 over US 68 ""A"" & Lima Ave ""H""
Built 2019
SR15E RAMP to US68 over IR75 & SB USR68 RAMP B
Built 2018
IR 75 over NS RR
Built 2019
IR 75 over NS RR
Built 2019
SR15 Rmp to US68E over SB IR75 RAMP A & RR
Built 2018
C144 HARRISON ST over IR 75
Built 2018
CR88(SANDUSKY ST) over IR 75
Built 2004
SR 12 over IR 75
Built 2003
Bridge Details
- Structure #
- 3202208
- Year Built
- 2019
- Length
- 29.3 m (96.1 ft)
- Max Span
- 28.3 m
- Width
- 28.1 m (92.2 ft)
- Lanes
- 4
- Daily Traffic
- 17,879
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.