NB IR75 off Ramp over to US52 (Hopple Str)

US52 and NB 75 · County 061, Ohio · Built 2015 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3101578
Year Built
2015
Length
46.9 m (153.9 ft)
Max Span
22.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.