US27 frm 52 to 75N over to IR75N IR74W

Hopple Ramp to IR75N · County 061, Ohio · Built 2015 · 1 Lanes · 4,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3101577
Year Built
2015
Length
145.1 m (476 ft)
Max Span
40.8 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.