IR 75 over OV RAMP G I-75NB - I-74W

At I-74/75 interchange · County 061, Ohio · Built 2020 · 8 Lanes · 128,251 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
3109763
Year Built
2020
Length
29.4 m (96.5 ft)
Max Span
27 m
Width
45 m (147.6 ft)
Lanes
8
Daily Traffic
128,251
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.