RTE I190 over PERRY BOULEVARD ERIE ST

EXIT N7 OF I190 · County 029, New York · Built 1956 · 1 Lanes · 14,341 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000552015F
Year Built
1956
Reconstructed
1991
Length
264.9 m (869.1 ft)
Max Span
26.8 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
14,341
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,607,000
Total Project Cost
$15,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.