MAIN AND PEARL ST over SKYWAY RAMP ""B"" TO 190IX

0.1 MI S JCT RTS I190 5 · County 029, New York · Built 1944 · 6 Lanes · 1,036 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000002263940
Year Built
1944
Length
12.5 m (41 ft)
Max Span
10.9 m
Width
150.6 m (494.1 ft)
Lanes
6
Daily Traffic
1,036
Material
Steel
Design
Frame (except frame culverts)
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$15,984,000
Total Project Cost
$25,345,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.