Ramp from NY15 NB over Erie Canal Canal Bike T

At I390 in Rochester · County 055, New York · Built 2014 · 1 Lanes

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000004445320
Year Built
2014
Length
110.3 m (361.9 ft)
Max Span
45.4 m
Width
11.3 m (37.1 ft)
Lanes
1
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,674,000
Total Project Cost
$5,826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.