RTE I390 over Erie Canal Trailway ERI
ROCHESTER OUTER LOOP N.B. · County 055, New York · Built 1978 · 4 Lanes · 36,088 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.108617, -77.610419
This bridge is in worse condition than 62.3% of bridges in County 055. The average bridge in New York is 0 years old; this one is 48 years old.
Nearby Bridges
RTE I390 over Erie Canal Traiway ERIE
Built 1978
RTE 15A over 390I390I43031142 RTE I3
Built 1981
RTE 15A over Bicycle pedestrian path
Built 2016
Ramp NFE over Ramp DH
Built 2016
RTE I390 over Erie Canal Pathway ERIE
Built 1981
RTE I390 over 590I590I43011002 RTE I5
Built 1981
RTE I390 over Erie Canal Pathway ERIE
Built 1981
RTE I590 over 590I590I43011002 RTE I3
Built 1981
EW CONNECTION over 390I390I43031146 RTE I3
Built 1981
RTE I590 over SOUTH CLINTON AVENUE
Built 1981
Bridge Details
- Structure #
- 000000004443861
- Year Built
- 1978
- Length
- 107.6 m (353 ft)
- Max Span
- 47.8 m
- Width
- 21 m (68.9 ft)
- Lanes
- 4
- Daily Traffic
- 36,088
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,483,000
- Total Project Cost
- $10,279,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.