RTE I390 over Erie Canal Pathway ERIE

IN EAST BRIGHTON · County 055, New York · Built 1981 · 4 Lanes · 38,877 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000004443851
Year Built
1981
Length
96.6 m (316.9 ft)
Max Span
43.5 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
38,877
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,650,000
Total Project Cost
$8,959,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.