RTE I390 over Erie Canal Pathway ERIE

IN EAST BRIGHTON · County 055, New York · Built 1981 · 4 Lanes · 42,407 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000004443852
Year Built
1981
Length
91.4 m (299.9 ft)
Max Span
41.1 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
42,407
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,345,000
Total Project Cost
$8,476,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.