RTE 15 over Canalway Trail 390I390I

RTE. 15 OVER CANAL · County 055, New York · Built 1981 · 5 Lanes · 31,271 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000004070890
Year Built
1981
Reconstructed
2015
Length
114.6 m (376 ft)
Max Span
56.9 m
Width
28.7 m (94.2 ft)
Lanes
5
Daily Traffic
31,271
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,696,000
Total Project Cost
$16,959,000