RTE 31 over ERIE CANAL

JCT BARGEC+31 W SIDE ROCH · County 055, New York · Built 1937 · 3 Lanes · 13,103 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000004443380
Year Built
1937
Length
36 m (118.1 ft)
Max Span
34.4 m
Width
12.9 m (42.3 ft)
Lanes
3
Daily Traffic
13,103
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,526,000
Total Project Cost
$8,762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.