Ramp A over Drainage Culvert Ramp E

South of Lyell Ave. · County 055, New York · Built 2019 · 1 Lanes · 4,667 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001079900
Year Built
2019
Length
58.8 m (192.9 ft)
Max Span
56.4 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
4,667
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,878,000
Total Project Cost
$2,977,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.