RTE 390 over RAMP NW TO I390 NB
I390 and I490 Interch. · County 055, New York · Built 2020 · 2 Lanes · 104,009 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.1594, -77.681403
This bridge is in worse condition than 8.4% of bridges in County 055. The average bridge in New York is 0 years old; this one is 6 years old.
Nearby Bridges
Ramp A over Drainage Culvert Ramp E
Built 2019
RAMP490I EB over RTE I390 RTE I490
Built 1961
RTE I490 over RTE 390 I490EB TO 390 N
Built 1961
RTE 390 over RAMP SW TO I490 WB 4904
Built 2020
RTE 390 over RTE I490
Built 1963
RTE I490 over RTE I390
Built 1963
RTE 390 over 490490I43021178 390I SB
Built 2021
RTE I490 over RTE I390 RTE I490
Built 1963
RTE I390 over RTE I490 RAMP I490WB T
Built 1963
RTE 31 over 390 390 43011005 RTE 39
Built 2018
Bridge Details
- Structure #
- 000000001080410
- Year Built
- 2020
- Length
- 123.4 m (404.9 ft)
- Max Span
- 61 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 104,009
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,543,000
- Total Project Cost
- $8,788,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.