RTE 907P over RTE 907P RAMP TO NB HRD
5.6 MI NE FDR DR+ROUTE 25 · County 061, New York · Built 1966 · 3 Lanes · 82,471 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
40.831894, -73.935261
This bridge is in worse condition than 90.7% of bridges in County 061. The average bridge in New York is 0 years old; this one is 60 years old.
Nearby Bridges
RTE 907P over HARLEM RVR SHORE
Built 1966
RTE I87 over RELIEF
Built 1976
RTE 907 over 87I 87IX1M11022 RTE I87
Built 1895
A.C.POWEL BLVD NB over WILLIE MAYS DRIVE
Built 1940
RTE 907P over RTE 907P RTE 907P RTE
Built 1966
RTE I87 over RAMP C HARLEM RIVER ME
Built 1976
RTE I87 over RELIEF
Built 1951
Ramp to NB 87I over RELIEF
Built 1951
RTE I87 over RELIEF
Built 1951
WEST 153RD STREET over WILLIE MAYS DRIVE
Built 1935
Bridge Details
- Structure #
- 000000001077040
- Year Built
- 1966
- Length
- 506 m (1660.1 ft)
- Max Span
- 28.6 m
- Width
- 11.9 m (39 ft)
- Lanes
- 3
- Daily Traffic
- 82,471
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $31,103,000
- Total Project Cost
- $49,317,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.