RTE 907P over RTE 907P RTE 907P RTE

5.8 MI NE FDR DR+ROUTE 25 · County 061, New York · Built 1966 · 1 Lanes

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000001077050
Year Built
1966
Length
258.2 m (847.1 ft)
Max Span
37.8 m
Width
8.5 m (27.9 ft)
Lanes
1
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,280,000
Total Project Cost
$17,885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.