RTE I87 over RELIEF
MACOMBS DAM PARK · County 005, New York · Built 1951 · 2 Lanes · 17,503 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.827664, -73.931328
This bridge is in worse condition than 55.9% of bridges in County 005. The average bridge in New York is 0 years old; this one is 75 years old.
Nearby Bridges
RTE I87 over METRO NO COMMUTER
Built 1951
RTE I87 over RAMP C HARLEM RIVER ME
Built 1976
RTE I87 over RELIEF
Built 1951
Ramp to NB 87I over RELIEF
Built 1951
RTE I87 over METRO NO COMMUTER
Built 1976
RTE I87 over METRO NO COMMUTER
Built 1954
EXTERIOR STREET over 87I 87IXM11014 METRO NO
Built 2010
RTE I87 over RELIEF
Built 1976
RTE 907 over 87I 87IX1M11022 RTE I87
Built 1895
A.C.POWEL BLVD NB over WILLIE MAYS DRIVE
Built 1940
Bridge Details
- Structure #
- 00000000124009A
- Year Built
- 1951
- Reconstructed
- 2002
- Length
- 46 m (150.9 ft)
- Max Span
- 16.1 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 17,503
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,595,000
- Total Project Cost
- $5,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.