RTE I190 over 190IX RTE I190
INT N8 ON I-90 · County 029, New York · Built 1972 · 1 Lanes · 5,631 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.889583, -78.889064
This bridge is in worse condition than 40.1% of bridges in County 029. The average bridge in New York is 0 years old; this one is 54 years old.
Nearby Bridges
RTE I190 over 190IX RTE I190 RAMP H
Built 1972
190IX NB OFF-RAMP over RELIEF
Built 1956
190IX NB ON-RAMP “ over RELIEF
Built 1956
RTE 950E over RTE I190 RELIEF
Built 1956
RTE I190 over PERRY BOULEVARD ERIE ST
Built 1956
ERIE ST & PERRY over 190IX CSX TRANS/AMTRAK
Built 1945
PORTER AVE RAMP P over 190IX NB OFF RAMP N TO
Built 1972
PORTER AVE over 190IX RTE I190 CSX /AM
Built 2016
PEARL ST OFF RAMP over FRANKLIN STREET
Built 1955
RTE 951K over BUFFALO SKYWAY LOWER TE
Built 1969
Bridge Details
- Structure #
- 000000001063090
- Year Built
- 1972
- Length
- 157.9 m (518 ft)
- Max Span
- 34.4 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 1
- Daily Traffic
- 5,631
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,882,000
- Total Project Cost
- $7,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.