RTE I84 over FAIR STREET
.6 MI SE I84 EXIT 61 · County 079, New York · Built 1968 · 2 Lanes · 21,527 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.465278, -73.644678
This bridge is in worse condition than 52.8% of bridges in County 079. The average bridge in New York is 0 years old; this one is 58 years old.
Nearby Bridges
RTE I84 over FAIR STREET
Built 1968
RTE I84 over RTE 311
Built 1968
RTE I84 over RTE 311
Built 1968
RTE 311 over STUMP POND STREAM
Built 1936
LUDINGTON CT over DREW LAKE OUTLET
Built 1925
RTE I84 over BULLET HOLE ROAD
Built 1968
RTE I84 over BULLET HOLE ROAD
Built 1968
LAKE SHORE DRIVE over LAKE CARMEL OUTLET
Built 1925
TOWNERS ROAD over M.BR.CROTON RIVER
Built 1995
RTE I84 over STUMP POND STREAM
Built 1968
Bridge Details
- Structure #
- 000000001052782
- Year Built
- 1968
- Reconstructed
- 2006
- Length
- 29.9 m (98.1 ft)
- Max Span
- 28 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 21,527
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,658,000
- Total Project Cost
- $4,214,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.