RTE 311 over STUMP POND STREAM

0.3 MI W JCT RTS 311+I84 · County 079, New York · Built 1936 · 2 Lanes · 9,135 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000001045590
Year Built
1936
Length
10.1 m (33.1 ft)
Max Span
4.6 m
Lanes
2
Daily Traffic
9,135
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,070,000
Total Project Cost
$1,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.