RTE I84 over STUMP POND STREAM

2.3 MI SE EXIT 58 OF I84 · County 079, New York · Built 1968 · 4 Lanes · 42,744 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000001052760
Year Built
1968
Length
20.7 m (67.9 ft)
Max Span
9.1 m
Lanes
4
Daily Traffic
42,744
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,268,000
Total Project Cost
$3,595,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.