RTE 4 over POULTNEY RIVER
JCT RTE 4 & VT STATE LINE · County 115, New York · Built 1949 · 2 Lanes · 7,413 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.586461, -73.295272
This bridge is in worse condition than 61.4% of bridges in County 115. The average bridge in New York is 0 years old; this one is 77 years old.
Nearby Bridges
RTE 4 over POULTNEY RIVER
Built 1949
PECKS WOODS ROAD over POULTNEY RIVER
Built 1935
PECKS WOODS ROAD over POULTNEY RIVER
Built 1935
US 00004 ML over CASTLETON RIVER
Built 1971
US 00004 ML over CASTLETON RIVER
Built 1971
TR 00TH6 over TH NO 6 OVER US 4
Built 1971
C3008 over CASTLETON RIVER
Built 1960
C3050 over CASTLETON RIVER
Built 1919
VT 0004A ALT over CASTLETON RIVER
Built 1924
US 00004 ML over US 4 OVER VT 22A
Built 1971
Bridge Details
- Structure #
- 000000001001150
- Year Built
- 1949
- Reconstructed
- 2004
- Length
- 34.1 m (111.9 ft)
- Max Span
- 33.5 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 7,413
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,520,000
- Total Project Cost
- $2,410,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.