C3050 over CASTLETON RIVER

0.02 MI TO JCT W CL2 TH1 · County 021, Vermont · Built 1919 · 1 Lanes · 640 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
101107000411071
Year Built
1919
Reconstructed
1961
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
4 m (13.1 ft)
Lanes
1
Daily Traffic
640
Material
Steel
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$323,000
Total Project Cost
$473,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.