PECKS WOODS ROAD over POULTNEY RIVER
8 MI NE OF WHITEHALL · County 021, Vermont · Built 1935 · 2 Lanes · 674 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
43.596022, -73.292397
This bridge is in worse condition than 24.1% of bridges in County 021. The average bridge in Vermont is 0 years old; this one is 91 years old.
Nearby Bridges
PECKS WOODS ROAD over POULTNEY RIVER
Built 1935
US 00004 ML over CASTLETON RIVER
Built 1971
US 00004 ML over CASTLETON RIVER
Built 1971
TR 00TH6 over TH NO 6 OVER US 4
Built 1971
RTE 4 over POULTNEY RIVER
Built 1949
RTE 4 over POULTNEY RIVER
Built 1949
US 00004 ML over US 4 OVER VT 22A
Built 1971
US 00004 ML over US 4 OVER VT 22A
Built 1971
US 00004 ML over US 4 OVER T.H. 21
Built 1970
US 00004 ML over US 4 OVER T.H. 21
Built 1970
Bridge Details
- Structure #
- 101107000611071
- Year Built
- 1935
- Reconstructed
- 2003
- Length
- 25.6 m (84 ft)
- Max Span
- 25 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 674
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $532,000
- Total Project Cost
- $844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.