HWY 213 over DRAINAGE DITCH
NE OF BWAR13 · County 013, New Mexico · Built 1938 · 2 Lanes · 600 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.295019, -106.4008
This bridge is in worse condition than 46.7% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 88 years old.
Nearby Bridges
SVAD Access Road over Storm Drainage
Built 2017
HWY 213 over DRAINAGE DITCH
Built 1938
HEADQUARTERS AVE over STROM DRAINAGE
Built 2020
HWY 213 over Drainage Ditch
Built 1941
HWY 213 over DRAINAGE DITCH
Built 1941
HWY 213 over DRAINAGE DITCH
Built 1941
HWY 213 over DRAINAGE DITCH
Built 1941
NM 213 over STORM DRAINAGE
Built 1965
HWY 213 over DRAINAGE DITCH
Built 1941
Bridge Details
- Structure #
- DAPTRABLI000015
- Year Built
- 1938
- Length
- 8.2 m (26.9 ft)
- Max Span
- 1.6 m
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Steel
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.