NM 213 over STORM DRAINAGE

0.3 MI N FR SOLAR PANELS · County 013, New Mexico · Built 1965 · 3 Lanes · 2,050 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
DAPATEWHI0RR1B1
Year Built
1965
Reconstructed
2010
Length
8.2 m (26.9 ft)
Max Span
2.6 m
Lanes
3
Daily Traffic
2,050
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.