RD 4280 over unnamed wash
3.9 mi E-NE Navajo Dam · County 045, New Mexico · Built 2023 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
36.810364, -107.679392
This bridge is in worse condition than 42.5% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 0405-712
- Year Built
- 2023
- Length
- 26.6 m (87.3 ft)
- Max Span
- 25.9 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.