NM-173 over PUMP CANYON
3.11 MI W OF JCT NM-511 · County 045, New Mexico · Built 1977 · 2 Lanes · 592 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
36.791953, -107.722989
This bridge is in worse condition than 80.5% of bridges in County 045. The average bridge in New Mexico is 0 years old; this one is 49 years old.
Nearby Bridges
NM-511 over GOBERNADOR WASH
Built 1959
NM-173 over SAN JUAN RIVER
Built 1967
RD 4280 over unnamed wash
Built 2023
New Mexico Rd 511 over Navajo Dam Spillway
Built 1942
US-64 over UNNAMED WATERWAY
Built 1952
45-4599 over IRRIGATION DITCH
Built 1966
45-4450 over BLANCO CANYON
Built 2011
US-64 over WRIGHT CANYON
Built 1995
Bridge Details
- Structure #
- 000000000007666
- Year Built
- 1977
- Length
- 63.7 m (209 ft)
- Max Span
- 24.4 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 592
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.