BIA RT. 101 over DRY WASH
EAST OF NAMBE RESERVOIR · County 049, New Mexico · Built 2005 · 1 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.848522, -105.897592
This bridge is in worse condition than 48.6% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 21 years old.
Nearby Bridges
BIA ROUTE 101 over INLET TO NAMBE RESERVOIR
Built 2014
BIA RT. 111 over NAMBE RIVER
Built 2005
NM-592 over UNNAMED WATERWAY
Built 1965
IRR/US-84/285 over UNNAMED WATERWAY
Built 1959
US-84/285 over TESUQUE PUEBLO ROAD
Built 2004
US-84/285 over CAMEL ROCK ROAD
Built 2004
TP828 over LOCAL DRAINAGE
Built 2020
IRR/US-84/285 over UNNAMED WATERWAY
Built 1959
IRR/US84/285/ Fr over UNNAMED WATERWAY
Built 1959
IRR/US-84/285 over UNNAMED WATERWAY
Built 1959
Bridge Details
- Structure #
- 0000M25708B0222
- Year Built
- 2005
- Length
- 6.5 m (21.3 ft)
- Max Span
- 2.9 m
- Width
- 8 m (26.2 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Steel
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.