NM-592 over UNNAMED WATERWAY
1.5 MI E OF JCT SFCR 73 · County 049, New Mexico · Built 1965 · 2 Lanes · 1,212 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.795675, -105.928981
This bridge is in worse condition than 64.3% of bridges in County 049. The average bridge in New Mexico is 0 years old; this one is 61 years old.
Nearby Bridges
NM-592 over UNNAMED WATERWAY
Built 1965
US-84/285 over COUNTY ROAD 73
Built 2004
49-0073 over UNNAMED WATERWAY
Built 1932
IRR/US-84/285 over UNNAMED WATERWAY
Built 1959
US-84/285 over RIO TESUQUE
Built 2004
IRR BIA RTE 804 over ARROYO
Built 1994
IRR/US84/285/ Fr over UNNAMED WATERWAY
Built 1959
IRR/US-84/285 over UNNAMED WATERWAY
Built 1959
49-0073 over UNNAMED WATERWAY
Built 1932
IRR BIA RTE 804 over ARROYO
Built 1994
Bridge Details
- Structure #
- 000000000006659
- Year Built
- 1965
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 1,212
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $68,000
- Total Project Cost
- $102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.