NM-345 over RINCONADA CHANNEL
2.3 MI N OF I-40 · County 001, New Mexico · Built 1987 · 4 Lanes · 24,074 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.12535, -106.725639
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
NM-345 over LADERA CHANNEL
Built 1987
NM-345 over San Antonio Arroyo
Built 1981
FL-5317 over SAN ANTONIO ARROYO
Built 1970
FL-5021 over SAN ANTONIO ARROYO
Built 1970
FL-4001 over Ouray Road
Built 2007
NM-345 Unser Blvd. over MIREHAVEN CHANNEL
Built 1987
01-Z000 over SAN ANTONIO ARROYO
Built 1985
NM-45 over SAN ANTONIO ARROYO
Built 1978
NM-345 over UNNAMED WATERWAY
Built 1984
NM-45 over I-40 WB Off to Coors SB
Built 2007
Bridge Details
- Structure #
- 000000000010063
- Year Built
- 1987
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 24,074
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.