FL-5021 over SAN ANTONIO ARROYO
0.05 ME SW OF UNSER BLVD · County 001, New Mexico · Built 1970 · 2 Lanes · 328 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.145022, -106.7133
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
01-Z000 over SAN ANTONIO ARROYO
Built 1985
FL-5317 over SAN ANTONIO ARROYO
Built 1970
FL-4018 over Mariposa Diversion chanl
Built 1983
NM-345 over San Antonio Arroyo
Built 1981
NM-45 over SAN ANTONIO ARROYO
Built 1978
FL-5068 over Boca Negra Arroyo
Built 1991
Tres Gracias Rd over San Antonio Arroyo
Built 2020
FL-5047 over Mariposa Arroyo
Built 1990
Sevilla Ave over San Antonio Arroyo
Built 2005
Tesuque Drive over Mariposa Arroyo
Built 1992
Bridge Details
- Structure #
- 000000000010083
- Year Built
- 1970
- Length
- 10.1 m (33.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 328
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.