IRR BIA RTE 201 over RIO PUEBLO RIVER
S.EDGE SAN LORENZO PUEBLO · County 055, New Mexico · Built 1989 · 2 Lanes · 500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.198639, -105.711303
This bridge is in worse condition than 50.5% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 37 years old.
Nearby Bridges
IRR BIA RTE 201 over BYPASS
Built 2000
IRR/NM-75 over RIO DEL PUEBLO
Built 1988
55-057 over RIO LUCIO
Built 1980
55-Z023 over RIO SANTA BARBARA
Built 1974
IRR/NM-75 over RIO DEL PUEBLO
Built 1989
55-042 over SANTA BARBARA RIVER
Built 1984
55-Z004 over RIO PUEBLO
Built 1974
NM-73 over RIO SANTA BARBARA
Built 1958
55-064 over Rio del Pueblo
Built 1992
NM-76 over LAS TRAMPAS RIVER
Built 1967
Bridge Details
- Structure #
- 00000000000M209
- Year Built
- 1989
- Length
- 21.9 m (71.9 ft)
- Max Span
- 13.7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.