NM-73 over RIO SANTA BARBARA
1.60 MI S OF JCT NM-75 · County 055, New Mexico · Built 1958 · 2 Lanes · 1,655 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.150453, -105.673772
This bridge is in worse condition than 69.9% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 68 years old.
Nearby Bridges
55-042 over SANTA BARBARA RIVER
Built 1984
55-Z023 over RIO SANTA BARBARA
Built 1974
55-057 over RIO LUCIO
Built 1980
55-Z004 over RIO PUEBLO
Built 1974
IRR/NM-75 over RIO DEL PUEBLO
Built 1989
55-064 over Rio del Pueblo
Built 1992
IRR BIA RTE 201 over BYPASS
Built 2000
IRR BIA RTE 201 over RIO PUEBLO RIVER
Built 1989
FDR 116 over SANTA BARBARA CREEK
Built 1965
55-045 over SANTA BARBARA RIVER
Built 1984
Bridge Details
- Structure #
- 000000000006052
- Year Built
- 1958
- Length
- 9.7 m (31.8 ft)
- Max Span
- 9.4 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,655
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $85,000
- Total Project Cost
- $128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.