I-25 NB over Unnamed Waterway
0.7 M S Jct I-25/NM-408 · County 053, New Mexico · Built 2019 · 2 Lanes · 11,555 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.147306, -106.914194
This bridge is in worse condition than 50.8% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 7 years old.
Nearby Bridges
I-25 SB over Unnamed Waterway
Built 2019
I-25 South Bound over NM-408
Built 2019
I-25 NB over NM-408
Built 2019
I-25 SBL over Ojitos Arroyo
Built 2019
I-25 NBL over Ojitos Arroyo
Built 2019
NM-408 over SOCORRO MAIN CANAL
Built 1955
I-25 NBL/SBL FR RD over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL FR RD over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL/FR RD over UNNAMED WATERWAY
Built 1958
53-A146 over RIO GRANDE
Built 1986
Bridge Details
- Structure #
- 000000000009768
- Year Built
- 2019
- Length
- 41.1 m (134.8 ft)
- Max Span
- 13.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 11,555
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.