I-25 NBL/SBL FR RD over UNNAMED WATERWAY
0.6 MI N OF JCT NM-408 · County 053, New Mexico · Built 1931 · 4 Lanes · 12,116 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
34.166156, -106.920044
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 95 years old.
Nearby Bridges
I-25 NBL/SBL FR RD over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL/FR RD over UNNAMED WATERWAY
Built 1958
I-25 NB over NM-408
Built 2019
I-25 South Bound over NM-408
Built 2019
NM-408 over SOCORRO MAIN CANAL
Built 1955
I-25 SB over Unnamed Waterway
Built 2019
I-25 NB over Unnamed Waterway
Built 2019
I-25 NBL/SBL FR RD over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL FR RD over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL over ARROYO PUERTECITO
Built 1958
Bridge Details
- Structure #
- 000000000003159
- Year Built
- 1931
- Reconstructed
- 1958
- Length
- 9.4 m (30.8 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 12,116
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $930,000
- Total Project Cost
- $1,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.