I-25 NBL over Tijeras Arroyo
1.35 M S Jct Rio Bravo · County 001, New Mexico · Built 2016 · 2 Lanes · 51,483 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.004122, -106.643792
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 10 years old.
Nearby Bridges
I-25 SBL over Tijeras Arroyo
Built 2016
FL-5042 over I-25 NBLS/SBLS
Built 1973
I-25 NBL over Sandia Railroad Spur
Built 2016
I-25 SBL over Sandia Railroad Spur.
Built 2016
NM-47 over TIJERAS ARROYO
Built 1969
Murry Road over South Diversion Channel
Built 1968
Prosperity Avenue over South Diversion Channel
Built 1968
FL-5000 over BNSF R/R
Built 2008
FL-5000 over BNSF R/R Spur
Built 2008
FL-5000 SBL over Tijeras Arroyo
Built 2007
Bridge Details
- Structure #
- 000000000009676
- Year Built
- 2016
- Length
- 92.4 m (303.1 ft)
- Max Span
- 29.9 m
- Width
- 19.5 m (64 ft)
- Lanes
- 2
- Daily Traffic
- 51,483
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.