NM-47 over TIJERAS ARROYO
1.7 MI S JCT NM-47/NM-500 · County 001, New Mexico · Built 1969 · 4 Lanes · 12,453 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.001347, -106.651611
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 57 years old.
Nearby Bridges
Murry Road over South Diversion Channel
Built 1968
FL-5042 over I-25 NBLS/SBLS
Built 1973
I-25 SBL over Tijeras Arroyo
Built 2016
I-25 NBL over Tijeras Arroyo
Built 2016
NM-303 over SOUTH DIVERSION CHANNEL
Built 1969
I-25 SBL over Sandia Railroad Spur.
Built 2016
I-25 NBL over Sandia Railroad Spur
Built 2016
Prosperity Avenue over South Diversion Channel
Built 1968
FL-5000 over BNSF R/R
Built 2008
FL-5000 over BNSF R/R Spur
Built 2008
Bridge Details
- Structure #
- 000000000007107
- Year Built
- 1969
- Length
- 32.6 m (107 ft)
- Max Span
- 31.7 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 4
- Daily Traffic
- 12,453
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $460,000
- Total Project Cost
- $740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.