FL-5000 over Los Picaros Road
1.3 Mi S of Rio Bravo · County 001, New Mexico · Built 2008 · 2 Lanes · 6,064 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.0079, -106.6264
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 18 years old.
Nearby Bridges
University Blvd over Los Picaros Rd
Built 2013
FL-5000 SBL over Tijeras Arroyo
Built 2007
FL-5000 NBL over Tijeras Arroyo
Built 2007
FL-5000 over BNSF R/R
Built 2008
FL-5000 over BNSF R/R Spur
Built 2008
I-25 NBL over Sandia Railroad Spur
Built 2016
I-25 SBL over Sandia Railroad Spur.
Built 2016
I-25 NBL over Tijeras Arroyo
Built 2016
I-25 SBL over Tijeras Arroyo
Built 2016
I-25 North Bound over North Bound off Ramp
Built 2019
Bridge Details
- Structure #
- 000000000009394
- Year Built
- 2008
- Length
- 11.9 m (39 ft)
- Max Span
- 11 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 2
- Daily Traffic
- 6,064
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.