FL-5122 over Noreste Channel
0.13 MI N OF ALAMEDA BLVD · County 001, New Mexico · Built 1987 · 2 Lanes · 328 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.186303, -106.556561
This bridge is in worse condition than 49.2% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 39 years old.
Nearby Bridges
FL-4061 over Window G Channel
Built 1998
Fl-4057 over La Cueva Arroyo
Built 2003
FL-5005 over S. Domingo Baca Arroyo
Built 1975
FL-4057 over S. Domingo Baca Arroyo
Built 1992
Fl-4053 over La Cueva Arroyo
Built 2003
FL-5041 over S Domingo Baca Arroyo
Built 1990
I-25 NBL/SBL over LA CUEVA ARROYO
Built 1985
I-25 NBL over NM-528. (Alameda Avenue)
Built 1985
I-25 SBL over NM-528(Alameda Avenue).
Built 1985
FL-4053 over S Domingo Baca Arroyo
Built 1992
Bridge Details
- Structure #
- 000000000008899
- Year Built
- 1987
- Length
- 16.8 m (55.1 ft)
- Max Span
- 16.2 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 328
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.