FL-5041 over S Domingo Baca Arroyo

0.18 Mi S Paseo Del Norte · County 001, New Mexico · Built 1990 · 4 Lanes · 8,451 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000008823
Year Built
1990
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
22.8 m (74.8 ft)
Lanes
4
Daily Traffic
8,451
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$114,000
Total Project Cost
$171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.