L-00034 over I-40 EBL/WBL
1.35 M W Jct I-40/NM-41 · County 057, New Mexico · Built 1994 · 2 Lanes · 934 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.013442, -106.067639
This bridge is in worse condition than 64.3% of bridges in County 057. The average bridge in New Mexico is 0 years old; this one is 32 years old.
Nearby Bridges
NM-41 over I-40 EBLS/WBLS
Built 1970
I-40 EBL/WBL over MARTIN ROAD
Built 1969
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1970
NM-41 over ORTIZ ARROYO
Built 1966
NM-41 over UNNAMED WATERWAY
Built 1992
IN-4197 over I-40 EBL/WBL
Built 1994
FR-4066 over SALT DRAW
Built 1970
I-40 WBL over SALT DRAW
Built 1970
I-40 EBL over SALT DRAW
Built 1970
NM-41 over CIBOLO ARROYO
Built 1966
Bridge Details
- Structure #
- 000000000008854
- Year Built
- 1994
- Length
- 80.5 m (264.1 ft)
- Max Span
- 39.5 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 934
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.