I-40 EBL/WBL over MARTIN ROAD
3.67 MI WEST OF JCT NM-41 · County 057, New Mexico · Built 1969 · 4 Lanes · 28,807 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.0275, -106.103003
This bridge is in worse condition than 87.1% of bridges in County 057. The average bridge in New Mexico is 0 years old; this one is 57 years old.
Nearby Bridges
L-00034 over I-40 EBL/WBL
Built 1994
FR-4063 over I-40 EBLS/WBLS
Built 1966
NM-41 over I-40 EBLS/WBLS
Built 1970
I-40 EBL over BACHELOR DRAW
Built 1966
NM-41 over UNNAMED WATERWAY
Built 1992
NM-41 over ORTIZ ARROYO
Built 1966
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1970
IN-4197 over I-40 EBL/WBL
Built 1994
I-40 EBL over NM-344
Built 2004
I-40 WBL over NM-344
Built 2004
Bridge Details
- Structure #
- 000000000007055
- Year Built
- 1969
- Length
- 10 m (32.8 ft)
- Max Span
- 8 m
- Lanes
- 4
- Daily Traffic
- 28,807
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $366,000
- Total Project Cost
- $549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.