FR-4080 over I-40 EBL/WBL
15.9 M E Jct I-40/US-285 · County 057, New Mexico · Built 1992 · 2 Lanes · 532 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.995878, -105.381442
This bridge is in worse condition than 72.9% of bridges in County 057. The average bridge in New Mexico is 0 years old; this one is 34 years old.
Nearby Bridges
NM-3 over I-40 EBL/WBL
Built 1973
I-40 EBL/WBL over Pintada Tributary Arroyo
Built 2016
FR-4082 over I-40 EBLS/WBLS
Built 1973
FR-4072 over UNNAMED WATERWAY
Built 1973
I-40 EBL/WBL over EMPEDRADOS DRAW
Built 1937
FR-4072 over I-40 EBLS/WBLS
Built 1973
FR-4084 over I-40 EBL and WBL
Built 2005
57-Z106 over I-40 EBLS/WBLS
Built 1973
Bridge Details
- Structure #
- 000000000008641
- Year Built
- 1992
- Length
- 77 m (252.6 ft)
- Max Span
- 37.8 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 532
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.