57-Z106 over I-40 EBLS/WBLS
6.75 MI E OF JCT US-285 · County 057, New Mexico · Built 1973 · 2 Lanes · 13 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.003842, -105.546164
This bridge is in worse condition than 64.3% of bridges in County 057. The average bridge in New Mexico is 0 years old; this one is 53 years old.
Nearby Bridges
FR-4072 over I-40 EBLS/WBLS
Built 1973
I-40 EBL/WBL over EMPEDRADOS DRAW
Built 1937
FR-4072 over UNNAMED WATERWAY
Built 1973
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1956
NM-3 over I-40 EBL/WBL
Built 1973
US-285 over UNNAMED WATERWAY
Built 1940
US-285 over UNNAMED WATERWAY
Built 1940
US-285 over I-40 EBLS/WBLS
Built 1989
US-285 over UNNAMED WATERWAY
Built 1940
FR-4080 over I-40 EBL/WBL
Built 1992
Bridge Details
- Structure #
- 000000000007341
- Year Built
- 1973
- Length
- 68.3 m (224.1 ft)
- Max Span
- 33.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 13
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $5,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.