FL-4048 over I-25 NB Frontage Rd
Candelaria over Frtg/Albq · County 001, New Mexico · Built 1962 · 4 Lanes · 17,546 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
35.114556, -106.625864
This bridge is in worse condition than 98.6% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 64 years old.
Nearby Bridges
I-25 SBL over Candelaria Boulavard
Built 2002
I-25 NBL over Candelaria Boulavard
Built 2002
I-25 NBL over Menual Boulavard
Built 2002
I-25 SBL over Menaul Boulavard
Built 2002
IH2226 over NB & WB Frontage Roa
Built 2002
IN-2226 over University Boulavard
Built 2002
I-40 WBL over University Boulevard
Built 2002
IT-2226 over I-25 NB Frontage Road
Built 2002
I-40 EBL over University Boulavard
Built 2002
IG-2226 over I-40 SB & WB Frntage Rd
Built 2002
Bridge Details
- Structure #
- 000000000008502
- Year Built
- 1962
- Reconstructed
- 1987
- Length
- 64 m (210 ft)
- Max Span
- 21.9 m
- Width
- 27.1 m (88.9 ft)
- Lanes
- 4
- Daily Traffic
- 17,546
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $913,000
- Total Project Cost
- $1,370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.