I-25 SBL over Menaul Boulavard
I-25/I-40 Interchange · County 001, New Mexico · Built 2002 · 6 Lanes · 97,195 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.109189, -106.628008
This bridge is in worse condition than 28% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 24 years old.
Nearby Bridges
I-25 NBL over Menual Boulavard
Built 2002
IH2226 over NB & WB Frontage Roa
Built 2002
IT-2226 over I-25 NB Frontage Road
Built 2002
IG-2226 over I-40 SB & WB Frntage Rd
Built 2002
I-40 WBL over I-25 NB Frontage Road
Built 2002
I-40 EBL over I-25 NB Frontage Road
Built 2002
I-25 NBL over I-40/Frntge Rds/Ramps
Built 2002
I-25 SBL over I-40 and Frontage Roads
Built 2002
IN-2226 over University Boulavard
Built 2002
IO-2226 over SB & WB Frontage Roads
Built 2002
Bridge Details
- Structure #
- 000000000009939
- Year Built
- 2002
- Length
- 54.3 m (178.1 ft)
- Max Span
- 53 m
- Width
- 32.9 m (107.9 ft)
- Lanes
- 6
- Daily Traffic
- 97,195
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.